Commercial Demolition on Staten Island

Shopping-strip units, restaurants, offices and warehouse floors stripped out to a schedule, with the neighbours on either side still trading and the container in the lot out back.

Call (929) 693-7653What to have ready

What commercial demolition covers here

The commercial work on Staten Island is mostly strip-out: a space taken back to its shell between one tenant and the next, or ahead of a fit-out.

That means single-storey retail units in the shopping strips along Hylan Boulevard, Forest Avenue, Richmond Avenue and Victory Boulevard, restaurants, medical and professional offices, the older storefronts of the North Shore's main streets, and warehouse and industrial space on the west shore around Travis and Bloomfield. Partitions, ceilings, floor finishes, fixtures, millwork, kitchens, storefront systems where they are changing, and the redundant services behind all of it.

We work for tenants clearing a space at the end of a lease, landlords turning a unit over, and the general contractors and construction managers running the fit-out that follows. The fit-out date is usually fixed before a demolition contractor is called, so we plan the job backwards from it.

Strip-outs that fit a schedule

A commercial strip-out has a date at the end of it that somebody else is depending on. The fit-out crew is booked, the tenant has a lease start, the landlord has a rent-free period running down. Our job is to hand over a clean shell on that date, and the way to do it is to settle the constraints before the first day rather than discover them in the second week.

On Staten Island the constraints are usually gentler than elsewhere in the city, and that is worth knowing when you price the job. A strip unit has a wide parking lot and, in most strips, rear loading doors, so the container sits out back and the shopfront is never blocked. A west shore warehouse has a loading bay and a floor plate you can move around. What replaces the freight elevator as the constraint is the neighbours: a unit with a nail salon on one side and a pizzeria on the other, both open, both sharing a roof and a rear alley with you.

We walk the space with whoever holds the schedule, price the actual scope, and put the sequence in writing with the dates on it. If the landlord's rules on hours mean the job takes six working days rather than four, you know that before you sign, not after.

Call (929) 693-7653What to have ready

The rear of a Staten Island shopping strip with loading doors and a roll-off container backed up to one of them, a wide parking lot.

01 The strips

The lot out back, and the neighbours either side

A unit in a Hylan Boulevard strip has a shared roof, a shared rear alley, a neighbour trading on each side and a landlord with rules about the lot.

The shopfront gets papered from inside on day one, so the strip-out is invisible to the customers next door. Material moves out the rear doors to a container in the lot, in the hours the landlord allows, and the front sidewalk is never used. Restaurants add grease-laden ductwork, kitchen equipment, walk-in boxes and a floor that has usually been built up several times over, all of which change the number.

A long empty stripped commercial floor in a Staten Island warehouse, columns receding toward windows at the far end.

A stripped commercial floor

What we hold to on a live floor

The tenants who are staying

Work is phased so that the neighbouring units keep trading. Noisy work is grouped into the windows the landlord gives us, and the shared rear alley is never blocked.

Dust and the shared wall

Openings sealed, the demising walls checked for gaps before the ceiling comes down, negative pressure where the scope calls for it. The salon next door should not know the work is happening until it sees the new fit-out.

Hours

Construction work runs 7:00 AM to 6:00 PM on weekdays. Anything outside that needs an After Hours Variance filed a few business days ahead, and the landlord's own rules on top.

Services left live

The neighbour's meter, the shared sprinkler main, the roof drains and anything the fit-out is keeping are identified, tagged and protected before the ceiling comes down.

Common questions

How long does an office strip-out take?

It depends far more on the building than on the square footage.

A single-storey strip unit with rear doors and a container in the lot can be stripped in a few days. The same area on the upper floor of an older North Shore building, leaving by a stair, or a unit whose landlord only allows work before opening hours, takes longer, and the access is usually the thing that sets it.

Tell us the building and the date you are working to, and we will tell you on the first call whether the two fit.

Can you phase the work around tenants who are staying?

Yes, and in a shopping strip it is the normal way to work rather than a special request.

We agree the sequence and the hours with the landlord, group the noisy work into set windows, check the demising walls before anything comes down, keep the rear alley clear and keep material moving to the container rather than staged where anyone else has to walk past it. The tenants who are staying should be inconvenienced for known hours on known days, not surprised.

Can you work nights or weekends?

Only with an After Hours Variance from the Department of Buildings, and only if the landlord allows it.

Construction work runs 7:00 AM to 6:00 PM on weekdays. Work outside that needs a variance filed a few business days ahead, covering days inside a fourteen day window. Some strip landlords prefer early-morning strip-out because it keeps the trading day clear for their other tenants. Strips with apartments above usually refuse it. We will tell you which applies before we price it.